![]() |
Club
Members Tour Photos
The
GREAT SOUTHERN RAILWAY
March,
2001
Still in the works
at the Great Southern Railway
site.
Daves total layout
is about 400' with mostly sunset valley
code 250 aluminum
rail. Turnouts are SVRR nickle-brass,
powered by LGB
machines. Train operation will be Aristo Craft
Train Master and
Bridgewerks 15amp power supply.
This is the first
phase of the railroad and with any luck and
good weather, Dave
hopes to have a Central Division meet
out at his Great
Southern Railway site.
Nice Job !
Shows how train gets In & Out of the
Shop Building.
The bricks will be replaced with a trestle
in the near future.
One of the passing tracks. In the distance,
you can see a wooden post
with a shelf. This is one of the "Outdoor
Control" stands
Jim Stark putting down the ballast
Jim Stark & Bud Harris working on the
ballast
The "Golden Spike" (fancy brass screw) ceremony.
Thats me, (Dave Tucker) putting in the spike
large waterproof outdoor control stand, and
the picture
with the top removed (top left)
Close up of the Waterproof Control Unit
Dave's first attempt at scratch building
in G scale.
A three span thru girder bridge made from one piece of
steel channel 7" wide, 3" web, 67" long.
The detail pieces are ABS plastic shapes
cut to size and
put on with two part epoxy. The lettering
is custom decals.
